Knoxville Avenue Reconstruction (IL 40)
Specialties: Traffic Engineering/Studies, Surveying, Public Involvement, Transportation Engineering
Details
Years:
Planning & Design: 2019-2023
Location: Peoria, IL
TERRA is providing Phase I and II engineering services for the reconstruction of Knoxville Avenue (Illinois Route 40) between Pennsylvania Avenue and Lake Street in the City of Peoria. Our team’s Phase I responsibilities include CSS public involvement, roadway and intersection studies, storm sewer design, ADA/PROWAG improvements, bicycle and pedestrian accommodations for Complete Streets compliance, crash analysis, utility design, and traffic management studies. Phase II responsibilities include preparation of plans, specifications and estimates; right-of-way plats; route and land surveys, traffic control details, and preparation of lighting and signal plans.
As part of the ongoing traffic and alternative analysis effort, TERRA prepared traffic signal warrant studies for 31 intersections along the corridor in accordance with the ILMUTCD. The results of the warrant studies are being utilized in the development of a projected future year 2045 Synchro traffic model.