St. Paul Avenue
Lift Bridge
Specialities: Structural, Construction Engineering
Details
Year: 2013-2014
Location: Milwaukee, WI
Size: TBD
TERRA provided structural engineering and construction engineering services for the rehabilitation of the St. Paul Avenue vertical lift bridge over the Milwaukee River. The project had an aggressive 10-month completion schedule.
Construction consisted of:
Bridge Decking
Bridge House
Electrical & Mechanical
Hydraulic Systems
Rehabilitation or replacement
of the structural steelPoured-in-place concrete
Approach Spans